List of Major Jobs Complete

2013
No Project Client
1 Structured Cabling, Civil, Air Conditioning and Card Access System Petronas Lubricants International at Integra Tower Konsortium Jaya Sdn Bhd
2 Supply And Install Fiber Converter Carigali Hess Operating Company Sdn bhd
3 Supply And Install Fiber Optic Backbone Cable At Level 67 T2 To Level 37 T3 Carigali Hess Operating Company Sdn bhd
4 Renovation, Cabling and Electrical Work for new Mesralink Office at Hampshire Building for Petronas Dagangan Berhad Konsortium Jaya Sdn Bhd
5 Renovation, Data Cabling, Rewiring Lighting and CCTV Work for new office Petronas Dagangan Berhad at Kota Bharu Kelantan Konsortium Jaya Sdn Bhd
6 Supply, install Airconditioning System at Server Room PDB Office KLIA, Sepang Konsortium Jaya Sdn Bhd
7 Supply, install Airconditioning System at PDB Office Bayan Lepas, Pulau Pinang Konsortium Jaya Sdn Bhd
8 ICT Work – Supply and Installation of Fiber Optic Cable at Petronas Twin Tower 2 Suria Barat Sdn Bhd
9 Structured Cabling Works at Petronas Dagangan Berhad Ipoh Perak Tanjung Network Resources Sdn Bhd
10 Structured Cabling Works Radius GSA Sdn Bhd
11 Supply And Deliver (Telecommunication And Cable Plant System) KLCC Urusharta Sdn Bhd
12 Telecommunication And Cable Plant System At Level 68 Tower 2 Petronas Twin Tower GM2 Resources Sdn Bhd
13 Server room upgrade at Petronas Dagangan Berhad Kota Kinabalu Regional Office,Kota Kinabalu Aviation & Sepanggar Bay Fuel Terminal Konsortium Jaya Sdn Bhd
14 Civil, Air Conditioning and Cabling works Petronas Dagangan Berhad at Melaka TLLR Konsortium Jaya Sdn Bhd
15 Puling 24 core fiber optic cable at Petronas Twin Tower 1 From Level 8 WMF 1 (T1) to Data Center (T1) 80 mtr x 43 run Basenet Technology Sdn Bhd
16 Petronas Twin Tower 2 ICT Refurbishment Project Basenet Technology Sdn Bhd
17 Structured Cabling Works at Petronas Dagangan Berhad Tanjung Network Resources Sdn Bhd
18 Fiber Optic Works For Tower 3 Petronas Building (KLCC MDF TO TM MDF) Persiskom Sdn Bhd

 

2012
No Project Client
1 Supply & install 6 Core SM Outdoor Fiber Optic Cable (from basement MDF room to 6th floor server room ) Wisma UOA Damansara II Premium Oils & Fats Sdn Bhd
2 Install UTP Cat. 6 completed with termination both end, labeling & testing at Petronas Tower 3 Level 28 Basenet Technology Sdn Bhd
3 Electrical & Civil works at pencawang TNB Ampang Kejuruteraan Lebar Cahaya Sdn Bhd
4 Renovation and Electrical Works at The Ampwalk Jalan Ampang Flora ETC Sdn Bhd
5 Internal Telecommunication Cable Plant Support and Maintenance Work at Tower 3, KLCC KLCC Urusharta Sdn Bhd
6 Electrical & Civil works at pencawang Kampung Pandan & Bukit Bintang Kejuruteraan Lebar Cahaya Sdn Bhd
7 Install UTP Cat. 6 completed with termination both end, labelling & testing Horizontal Cabling At Tower 3 L31, L40,L48 & L55 Basenet Technology Sdn Bhd
8 Puling 24 core fiber optic cable at Petronas Twin TowerFrom WMF 1 (T1) to WMF 2 (T2) 500 mtr x 19 run Basenet Technology Sdn Bhd
9 Pulling Fiber Optic Cable 48core on Existing Tray from Maxis MDF to Bilding MDF at Level P1 at Petronas Tower 3 Binalite Electrical Engineering Sdn Bhd
10 Puling 24 core fiber optic cable at Petronas Twin TowerFrom WMF 1 (T1) to WMF 2 (T2) 500 mtr x 24 run Basenet Technology Sdn Bhd
11 Supply And Install PABX System Syntronic
12 Supply & Install FIBER OPTIC CABLE 12CORE FROM TCR ROOM TO SERVER ROOM BLOOMBERG at Tower 3 Petronas Binalite Electrical Engineering Sdn Bhd
13 Infrastructure Cabling System Egon Zehnder International
14 Supply And Deliver (Telecommunication And Cable Plant System) at Petronas Tower 3 KLCC Urusharta Sdn Bhd
15 ICT Cabling, Works At UKM Vieus Engineering Sdn Bhd
16 Level 24 Tower 3 Petronas (Ping Energy) Telecommunication Works ID Mode Sdn Bhd
17 Supply And Deliver (Telecommunication And Cable Plant System) at Petronas Tower 3 KLCC Urusharta Sdn Bhd
18 Server room upgrade and Air conditioning at PDB Office peninsular malaysia:- Civil works, Cabling work & Fire Suppresion system Konsortium Jaya Sdn Bhd
19 Supply And Deliver (Telecommunication And Cable Plant System) KLCC Urusharta Sdn Bhd
20 Supply & Install FIBER OPTIC CABLE 12CORE FROM TCR ROOM TO SERVER ROOM GOLDFIN at Tower 3 Petronas Binalite Electrical Engineering Sdn Bhd
21 Supply and Install fiber optic cable 12core from TCR room level 25th Floor to server room Mckinsey at Tower 3 Petronas Binalite Electrical Engineering Sdn Bhd
22 Supply, install Airconditioning system at PDB Office Kuching Glorify Crest Synergy

Facebook

Address

C 1-8A, Jalan 12/144A, Taman Bukit Cheras 56000 Kuala Lumpur, Malaysia.
Tel: + 603 9100 2248 Fax: + 603 91001606
Email: info@zanicom.com.my